Bolun Bicycle

Adult Mountain Bikes, Built to Your Container. Wholesale Only.

Time: 2026-11-14

Read: 0

BOLUN builds adult hardtail and full suspension mountain bikes in Xingtai, Hebei. We sell to distributors, importers, bike shop chains and private label brands. Orders move by the container. We do not run a shopping cart. We do not ship to a home address.

What the FOB Price Covers

That price depends on how many containers you take. We quote FOB, price on request, with volume tiers. Each tier is a quote method, not a web number. One tier fits a steady container program. Another fits a one-off first order. We do not print a per-bike price on this page. A per-bike quote without the loading form is not a real price.

Tooling is a separate line item: quoted, amortised over your first orders or bought outright, with ownership written into the contract before the tool is cut. A sample before the tier kicks in is quoted on its own. Sample cost and sample lead time are not hidden in the bike price.

We answer with a spec sheet and a price within the working days stated on the quotation we send you — not a promise on a web page, because the answer time depends on how complete your RFQ is.

MOQ by Model, Colour and Loading Form

MOQ is not one number for the whole catalogue. It is set per model, per colour and per loading form: one model one colour in a full container, one model in several colours, several models mixed in one container, and CKD/SKD all sit at different numbers. Ask for the tier that matches your container and we quote that tier.

FCL means one model, one colour, one size run. Mixed loading means several models share one 20GP or 40HQ. In a mixed container, each model must hold a floor share of the load. A colour under that share costs a paint change we cannot hide. The size range per model is listed in the spec sheet. Small and large sizes carry a minimum share in the order. The paint line and the box size both change per size.

Frame Welding and Material

This is where a cheap bike dies. We tell you what we weld how, before you ask.

  • TIG welding is used on the main triangle joints you can see: head tube, top tube, down tube. The bead is neat. It grinds smooth. It reads as a clean frame.
  • MIG (CO2) welding is used on the rear triangle and internal gussets you cannot see. It is fast. It is strong enough for the spec. It keeps cost down where the buyer never looks.
  • Weld bead grinding is done on the visible joints. If the bead is not ground flat, the paint will show it within a season. We do not grind hidden joints. That cost buys nothing on your shelf.
  • Butted tubing is used on the higher-tier frames in the catalogue. The wall is thicker at the ends and thinner in the middle. It saves weight without giving up joint strength. Which frames are butted is stated per model in the spec sheet.
  • Heat treatment applies to the frames and joints marked heat-treated in the spec sheet. It is quoted as a line item. The oven time is real cost.
  • Film thickness and salt spray hours are written into the spec sheet per model. Ask for the number before you approve the sample, and ask for the report, not the claim. Fatigue test standard and test load are printed there too. We send the test report, not a one-line claim.

Colour by Market

Colour moves differently in each region. Pick the wrong colour and you hold stock nobody wants.

Market Colours that move Colours that sit
EU / US Matte black, slate grey, dark olive, deep blue Bright candy red, fluorescent yellow, cheap-looking chrome
Middle East White, silver, bright blue, green, gold tones Dark brown, all-matte-black builds, muted earth tones
Southeast Asia Bright green, orange, sky blue, two-tone All-black fleets, dark forest green

We hold a standard colour range in the catalogue. Your own Pantone is fine, but it counts as a paint change. It also counts against the mixed-colour floor. Chrome and metallic flake cost more per frame. They show every scratch picked up on the sea freight.

Private Label Logo Process

You send the artwork. We carry it through five steps. Each step has an owner and a clock.

  1. Sampling. You send vector logo files and your Pantone numbers. We quote the method: silk screen, water decal or transfer decal. We build a small run of sample frames, within the working days stated in our sample quote.
  2. You confirm. You check the logo position, the size and the colour match against your Pantone. We do not open the paint line on an unconfirmed sample.
  3. Logo application. Silk screen is the cheapest and it lasts. Water decal is thinner and sits flat on the tube. Transfer decal covers curved tubes and small runs. Each method carries a different per-frame cost in the spec sheet.
  4. First article approval. Before the full run, we send photos of the first units off the line. You sign off by email. That email is the spec lock.
  5. Mass production. The line runs to the approved article. Any change after that email is a rework charge. The charge is on your side, not ours.

Spec Items on the Quotation Sheet

The quotation spec sheet is built item by item. Each item below is locked before the sample is cut. You check it again at sample approval.

  • Wheel size: chosen by your market, written on the RFQ, confirmed before the tube order.
  • Frame material: steel grade or aluminium grade, stated per model, confirmed with you in writing.
  • Fork: suspension or rigid, travel and lockout, matched to your price tier and your market.
  • Stem and handlebar: length, rise, flat bar or riser bar, matched to the rider profile you sell to.
  • Drivetrain: brand level and speed count, printed in the sheet, never assumed from a photo.
  • Brakes: rim or disc, mechanical or hydraulic, chosen per price tier and per market law.
  • Frame sizes: the size run per model, listed in the sheet, with the size mix you want.

Packing and Container Loading

Packing numbers are issued per model with the quotation: pcs per carton, carton size, gross and net weight, and load per 20GP and 40HQ. What we need from you first is the loading form — full container, mixed container, or CKD/SKD. Those three give different carton counts and different freight per unit, and the gap is big enough that a number quoted without the loading form is worthless.

Colour box sits on the upper spec tier in the quotation. Brown carton ships on the basic tier. Shipping mark is yours. You send the print file before the line opens.

From Deposit to Container Loading

After the deposit lands, the order moves in this order.

  1. Frame cutting and fixturing. Tubes are cut, mitred and held in welding jigs. This step sets the geometry. A mistake here is expensive to fix later.
  2. Welding and bead grinding. The main triangle is TIG welded. The rear triangle is MIG welded. Visible beads are ground flat before paint.
  3. Heat treatment, only on the frames marked for it in the sheet. The oven runs a fixed cycle. It cannot be rushed.
  4. Surface pretreatment and paint. Parts are cleaned, phosphated, sprayed and baked in sequence.
  5. Wheel building. Rims are laced to hubs, spokes are tensioned, and wheels are trued and dished.
  6. Assembly. Fork, headset, crankset, brakes and wheels are fitted, bolted and adjusted.
  7. Packing and loading. Bikes are boxed, cartons are palletised, and the container is sealed.

Two lines decide the lead time: welding and paint. The welding line caps how many frames leave the jigs each day. The paint line caps how many frames leave the bake oven each day. On a repeat order, the paint line usually decides. Every colour change stops the line for cleaning. On a custom-colour order, the paint line is the bottleneck from day one.

Which Loading Form Fits Your Order

Three loading forms, three different economics.

  • One model, one colour, full container. Take it when one model already sells in your market. The line runs straight. Reorders are fast. The paint line stops only once.
  • Mixed loading, two to four models. Take it when you must fill your shelf range at once. Each model still needs a share of the cartons. If a model sits too thin, the paint change cost does not spread. That model then loses money.
  • CKD or SKD. Take it when your local assembly and labour cost make the landed unit cheaper. The container holds more units. Your side carries the assembly line, the tools and the after-sales.

Pick the loading form first. The price, the carton count and the freight per unit all follow that choice.

What We Need Before We Quote

Send five items. Without these five we cannot give you a real number.

  1. Model or reference photo, and the sizes you want.
  2. Quantity for the first order, plus the per-year quantity you expect.
  3. Destination port, and FCL or mixed loading.
  4. Certification market: EU, US, GCC, or another. Each market is a separate test file and a separate cost.
  5. Logo files and Pantone reference, if this is a private label order.

Where Orders Go Wrong

We list these up front. They cost money after the container sails.

  • Weld bead not ground flat. The paint covers it for the photos, then cracks in the first season. Check the visible joints on the first article.
  • Mixed container too thin on each model. Every model under the share loses money on the paint change. Keep each model above the floor.
  • Carton too light for sea freight. Damage rate is set by the carton and the pallet, not by the bike. Ask for carton spec and drop test in writing.
  • Colour chosen from a screen. Pantone on a tube in the paint shop is not the colour on your phone. We send a sprayed panel before mass paint.
  • Logo method picked on price alone. The cheapest silk screen on a curved tube bubbles after six months in a humid warehouse. Match the method to the tube.

What Is on the Quotation Sheet

One page, these line items:

  • MOQ per tier: the minimum order for each loading form. Use it to size your first container.
  • Pcs per carton: how many bikes or parts go in one box. Use it to plan your warehouse unloading.
  • Carton size: length, width and height of the outer box. Use it to check it fits your rack and pallet.
  • Gross weight and net weight: the loaded box weight and the bike weight alone. Use it to check your truck and crane.
  • Load per 20GP and load per 40HQ: cartons per container. Use it to compare FCL quotes from other factories.
  • Film thickness: the dry paint film in microns. Use it to judge how long the paint will hold.
  • Salt spray hours: the corrosion test hours on a painted panel. Use it to compare factories on equal terms.
  • Drivetrain spec and brake spec: the exact parts fitted. Use it to check the price band your market expects.
  • Lead time: days from deposit and sample approval to container loading. Use it to plan your selling season.
  • Payment terms: the deposit percentage and the balance point. Use it to line up your financing.
  • Tooling cost: the one-off mould or fixture charge, separate from the bike price. Use it to choose amortise or buy outright.
  • Sample cost and sample lead time: the price and clock for the pre-production sample. Use it to lock the spec before mass production.
  • Certification covered: which market tests the spec passes. Use it to avoid a retest after the container sails.
  • Validity: how long the quoted price stands. Use it to order before the steel price moves.

Next Step

Send the five items above to the RFQ page. We come back with a spec sheet, the FOB price on request, and the volume tier that fits your container.

Where this sits on the site

If you are putting a container together, the pages below carry the model range, the trade terms and the quote form.