Three different things get called OEM by different buyers. Here is what each means at our factory, so we quote the right one.
| Term | What we do | Who owns the design |
|---|---|---|
| OEM on our frame | Your logo, your colour, your carton on a frame we already build | Frame drawing stays ours |
| ODM | We adapt an existing frame to your geometry or component request | Frame drawing stays ours, changes agreed in writing |
| Full custom frame | New frame and new tooling built to your drawing | Depends on who pays the tooling; written into the contract |
Full custom is slower and it costs tooling. For most first orders, OEM on our frame gets you to market faster and lets you test the colour before you spend on a new mould.
Step 1 — Artwork and Spec Sheet
You send: logo in vector (AI, EPS or PDF), colour reference (Pantone or a physical sample), carton artwork, and the warning text your market requires. We send back a spec sheet listing every part, the colour code, the decal position and the packing.
Until the spec sheet is signed, nothing goes to sampling. Half the arguments in this business come from a colour that was never written down.
Step 2 — Colour Proof
We spray a colour panel on the same pretreatment line and send it, or send a photo taken in daylight. You approve against a physical reference, not against a screen. Whether the panel is charged, and how long the spray slot takes, is stated on the quotation — a colour panel goes into the line between production runs, so the wait moves with the season.
Step 3 — Logo Application Method
| Method | Where it is used | Trade-off |
|---|---|---|
| Silk screen | Flat tube sections, simple one or two colour marks | Cheap per unit, breaks down on curves |
| Water decal | Down tube and top tube, multi-colour | Best look, slower to apply, needs a clear coat on top |
| Transfer decal | Complex artwork, small areas, head tube badge | Sharp detail, higher unit cost |
We recommend the method per frame, not per customer preference. A four-colour logo on a curved down tube is a water decal job, whatever the drawing says.
Step 4 — Sampling and First Article Approval
One or two bikes, built to the signed spec sheet. You check: colour against the approved panel, decal position and edges, weld appearance, brake and gear setup, carton print and carton strength.
First article approval is the gate. After you approve it, that sample is the reference for the whole run, and it stays here.
Sampling is charged at cost plus freight, and whether that cost comes back on your first order is written on the quotation. Sampling starts only after the spec sheet is signed and the colour panel is approved. We build the sample to the spec, not to a guess.
Step 5 — Tooling, If Any
New frame, new dropout, new hanger, new carton die — each is a separate tooling item with its own MOQ and its own lead time. Tooling is quoted as a line item and amortised over the first orders, or paid outright if you want the tool to be yours.
Who owns the tool is written into the contract before the tool is cut. If you pay for it outright, it is yours and we keep it here for your production.
The tooling cost, the amortisation schedule and who owns the tool are written into the quotation and the contract before the cut starts. We do not bury tooling inside the piece price, because then you would be paying for a mould you cannot see.
Step 6 — Production
Deposit books the slot. You get in-line photos at frame stage and at assembly stage, then loading photos with the seal number.
Step 7 — Packing and Repeat Orders
Carton spec, shipping mark, manual language, and the tool kit inside the box are all fixed at step 1 and are not changed mid-run. For repeat orders we keep the approved sample and the artwork file, so the second order does not re-open the colour question.
Where Private Label Orders Stall
- Artwork arrives as a JPG screenshot. It cannot be printed, and the deadline moves.
- Colour approved on a phone screen. It never matches the paint.
- Carton artwork approved after the cartons are printed.
- Warning text for the market left to us. We are not your legal adviser; you or your agent sign that off.
- Tooling paid late, so the mould is cut late, so the season is missed.
Next Step
Send logo files, colour reference, target market and first order quantity. We come back with a spec sheet, a tooling quote if needed, and a price on request with volume tiers.
Where this sits on the site
If you are putting a container together, the pages below carry the model range, the trade terms and the quote form.