On this page
- A model is not a product, it is a production run
- The five costs that decide the number
- Why 100 is a workable floor
- What to do if your order is genuinely smaller
- Where buyers lose money trying to lower MOQ
- How MOQ interacts with everything else
- A short checklist before you argue about MOQ
- Five costs, and how each behaves as the run grows
- Questions buyers ask
- Send us your order details
Every buyer asks for a lower MOQ. Almost no buyer asks why the MOQ exists. The answer is not policy or vanity — it is a set of fixed costs that have to land on a known number of units, and 100 per model is the point where those costs stay sane for both sides.
A model is not a product, it is a production run
A hundred units per model is a costing question. Send model, quantity and destination port through the RFQ; the reply returns FOB at that run and what changes below it.
What a factory actually schedules is a run: one frame specification, one colour set, one decal set, one bill of materials, one carton print. Change any of those and it is a different run. Two colours of the same frame are two paint batches. Two decal designs are two screen or transfer setups. Two carton prints are two print runs with their own minimums.
This is why “MOQ 100 per model” and “MOQ 100 per order” are completely different promises. A per-order MOQ of 100 across ten models means ten runs of ten units, which is a sample-room schedule, not a production schedule.
The five costs that decide the number
Paint. Powder coating or liquid paint is charged by batch preparation as well as by volume. A small batch still needs the line cleaned, the colour mixed, the oven brought to temperature and the parts hung. The paint cost per frame falls steeply as the batch grows, and below a certain batch it never becomes economic.
Decals. Water transfer or UV decals carry a setup and a minimum print quantity per design. A design ordered in a hundred units costs several times per unit what the same design costs in a thousand.
Cartons. Printed cartons have a minimum print run. A custom carton for forty bikes usually means paying for several hundred cartons and storing the surplus, or paying a small-run premium.
Line changeover. Wheels built, frames prepped, assemblies staged, then the line re-set for the next model. Changeover is time that produces nothing, and it is the same whether the run is 90 units or 900.
Setup documentation. The spec sheet, the QC points, the packing list template, the artwork approval — a fixed administrative cost per run that is trivial on a large order and painful on a small one.
Why 100 is a workable floor
At 100 units, the paint batch, the decal minimum and the carton run can be absorbed into a unit price that still makes sense at wholesale level. Below that, either the unit price rises sharply or the factory quietly substitutes cheaper components to keep the number — neither of which the buyer wants.
A hundred units also maps onto container economics. A 40HQ holds roughly 350 units of 26 inch mountain or 700c city bikes, so three models at 100 units is close to a sensible mixed container. For kids bikes at 85 percent assembly a 40HQ takes about 850 units of 12 to 20 inch, which allows a wider model spread without breaching the per-model floor.
What to do if your order is genuinely smaller
Three honest options, and none of them is “ask for an exception”.
First, take a model that is already running. If a model is in production for another buyer, a smaller addition can be absorbed into that run — the paint is mixed, the decals are printed, the cartons exist. Availability is the constraint, not goodwill.
Second, accept a stock colour and stock decal. The setup costs are what make small runs expensive; removing the setup removes most of the premium, and the unit price can often come close to the standard level.
Third, consolidate. Combine two small orders in the same season into one run, or buy with another dealer in your market. The factory does not care whose name is on the deposit; it cares that the run is a run.
Where buyers lose money trying to lower MOQ
The classic failure is ordering 40 units at a “small order premium” and then discovering that the carton surplus, the decal surplus and the higher unit price together cost more than the 60 extra bikes would have. The second classic is splitting one model into four colours at 25 units each, which turns one run into four and multiplies the setup four times.
If a price looks surprisingly low for a small quantity, ask which specification was changed to get there. It is usually the frame tube set, the groupset level or the carton.
How MOQ interacts with everything else
MOQ sits on top of payment terms, lead time and packaging, and changing one moves the others. Our standard terms are 30 percent deposit with the balance before loading, production 25 to 30 days and 30 to 45 days in peak season, FOB Tianjin or Qingdao. A smaller run does not shorten those windows; if anything it is scheduled around larger runs, so the calendar can be worse rather than better.
That is the part buyers underestimate: a small order does not buy flexibility, it buys a lower priority in the production queue.
A short checklist before you argue about MOQ
Is the 100 per model or per order? How many colours and decals per model — each one is another setup. Are the cartons stock or custom? Is the model already in production? Does the total container still make sense after the size split?
Answer those five and the MOQ conversation usually resolves itself, because the buyer can see which cost he is actually asking the factory to absorb.
Five costs, and how each behaves as the run grows
The floor on a model is not a policy number; it is where the fixed costs per run stop dominating the unit price. These five decide it.
| Cost | Fixed per run | Behaviour as quantity grows |
|---|---|---|
| Frame setup and jig change | Yes | Spreads once, then flat |
| Paint batch and colour change | Yes, per colour | Drops sharply if colours are consolidated |
| Decal and carton print run | Yes, per design | Spreads across the run, then flat |
| Line changeover and first-article check | Yes | Fixed regardless of size of run |
| Components and material | No | Falls only with supplier volume, slowly |
This is why the answer to a small order is rarely a lower price: four of the five costs do not care how many bikes you take. It is also why splitting colours hurts more than splitting sizes. To see the split on your own specification, send it through the RFQ form.
If your real order sits below the floor, the practical answer is usually in the MOQ planning page: consolidate colours, share a carton plate, or carry the shortfall on a second model rather than on a discount. Put the actual quantity and model list into a single enquiry and ask for the minimum per layer, not for a lower total.
Questions buyers ask
Is the 100 unit MOQ per model or per order?
Per model. A container can mix several models, but each model needs 100 units.
Can I order below 100 units of one model?
Sometimes, if the model is already in production or if you accept a stock colour and stock decal. Otherwise the setup costs make the unit price unattractive.
Do multiple colours count as multiple models?
Each colour is a separate paint batch and each decal is a separate setup, so a model split across four colours behaves like four small runs for costing.
How many models fit in one 40HQ?
About 350 units of 26 inch mountain or 700c city bikes, or about 850 units of 12 to 20 inch kids bikes at 85 percent assembly. That allows three or more models at the per-model floor.
Does a small order ship faster?
Usually not. Small runs are scheduled around larger ones, so the calendar can be slower, not faster.
Related guides
See how the MOQ changes the price in bicycle quotation sheet pitfalls, then plan the range with first container SKU mix planning and wholesale price tiers.
Send us your order details
For a wholesale quotation, tell us the models, quantities, size split, destination port and whether you need OEM branding. Write through the contact page or email bolunmaoyi@gmail.com. MOQ is 100 units per model, 30% deposit with the balance before loading, FOB Tianjin or Qingdao.
Category: bicycle buying guides index — the full guide list by topic. · Site map