On this page
- What “distribution” actually means after landing
- Start from sell-through, not from fairness
- Depth beats breadth in the first month
- The size curve is the real allocation decision
- Hold back a reserve, and say so out loud
- Replenishment rhythm beats a big first push
- Where the parts and accessories fit
- Pricing ladder across the range
- Measure three things, weekly
- The mistakes worth avoiding
- Questions buyers ask
- Send us your order details
A container of 350 mountain bikes is not one purchase decision. It is roughly a hundred and forty separate shop decisions, made over six to nine months, often by people who never see the container manifest. Dealers who get the landing distribution right sell out and reorder. Dealers who spread stock evenly across every shop end up with four shallow displays and a dead container.
What “distribution” actually means after landing
The first order is a mix question. Put the models, units and destination port in the RFQ; the reply returns FOB plus the CBM each model takes in the dealer’s first container.
There are three layers, and confusing them is the usual mistake. The first is the container split — which models and quantities you ordered. The second is the allocation — how many units of each model go to each shop, warehouse or online channel. The third is the release schedule — how many units you put on the floor now versus hold back.
Most of the difficulty shows up in the third layer, because the container arrives all at once and the selling takes a season.
Start from sell-through, not from fairness
An even allocation feels fair and performs badly. If you have six shops and one model in 300 units, even allocation gives fifty each: no shop can hold a full size run, every shop shows the same three sizes, and the strongest location — which could have sold eighty in the first month — is capped at fifty.
The better approach is to allocate by demonstrated sell-through. Take last season’s units per shop, adjust for location and footfall, and let the numbers differ. A flagship that turns stock monthly deserves twice the depth of a satellite store that turns it quarterly.
Depth beats breadth in the first month
The first month after landing is about presence. A shop with a full size run of one model, properly displayed, sells more than a shop with two units each of five models. Riders buy a size, not a brand statement, and a display that cannot serve a 175 cm customer sends them to the shop that can.
So resist the urge to open every model in every shop in week one. Open two or three hero models fully, keep the rest boxed in the back, and add them as hero models thin out. You will look narrower for three weeks and sell more over the season.
The size curve is the real allocation decision
Frame size distribution is where most first containers go wrong, because it is invisible on the order sheet and painfully visible at retail. A container built on an even size split leaves you with small frames nobody asks for and no mediums in month two.
The practical route is to set your size curve from your own historical sales by market, then apply it to every model. If you have no history, use the curve your sales staff believe in, write it down, and compare it against actual sales after the first season. The first season is the calibration; the second season is where the curve starts paying.
This is a decision you can take before ordering rather than after landing. Our MOQ is 100 units per model, and within that 100 the size split is yours to set. Buyers who specify the split in the purchase order get a container that fits their market; buyers who leave it to the factory get a generic split.
Hold back a reserve, and say so out loud
Hold back somewhere in the region of a fifth of each model as a reserve, kept in the central warehouse. The reserve does two jobs: it covers a shop that sells out early and needs a top-up without breaking the display, and it covers warranty replacements without cannibalising a live display.
The commercial discipline is to tell the shops the reserve exists. Otherwise the reserve gets treated as available stock, requested in week two, and gone by month three.
Replenishment rhythm beats a big first push
Bicycle retail is seasonal and lumpy. A dealer who pushes everything into the first six weeks runs dry in the peak and cannot reorder inside a normal production window — our lead time is 25 to 30 days, and 30 to 45 days in peak season, before freight. That is not a gap you can close quickly.
So plan two waves rather than one. The first wave takes the shops to a full display plus reserve. The second wave, released as sell-through data comes in, tops up the models that moved and moves depth to the locations that earned it. The container is the same; the release plan is what changes.
Where the parts and accessories fit
Container space is finite, and the last few cubic metres matter. Spare frames, forks, saddles, and a small parts kit for warranty use are worth loading if you have space after the bikes are packed, because the freight is effectively already paid. What is not worth doing is loading accessories that compete with your own aftermarket range and sit unsold for a year.
A practical rule: load only parts that support the bikes you are selling — the sizes and colours actually in the container — plus a warranty kit. Everything else can come in a later consolidated shipment once you know what actually fails.
Pricing ladder across the range
Allocation and pricing are the same conversation. If your container carries three tiers, the entry tier is the traffic builder, the mid tier is the volume seller, and the upper tier is the margin and the brand signal. Spreading all three evenly across every shop dilutes the signal and clutters the floor.
A workable pattern puts the full ladder in the flagship and one or two stores, the mid tier everywhere, and the entry tier in the highest-footfall locations where it converts. The upper tier in a small satellite shop is stock that ages.
Measure three things, weekly
Units sold per shop per model. Size mix sold versus size mix received. Days of cover remaining per model.
Those three numbers, taken weekly for the first eight weeks, tell you whether the allocation was right while there is still time to move stock between shops. After eight weeks, moving stock costs money and the season has decided for you.
The mistakes worth avoiding
Even allocation across shops because it feels fair. Opening every model in week one. Ignoring the size curve until the end of season. Treating the warehouse reserve as sellable stock. And loading accessories that have no relationship to the bikes in the box.
None of these are exotic failures. They are the ordinary consequences of planning the container and forgetting to plan the landing.
The first order is a distribution decision disguised as a purchase. The table shows what a dealer usually has to fix before the container is split.
| Decision | What it determines | Typical mistake |
|---|---|---|
| Tier mix | How much of the container goes to entry, mid and upper price | Ordering only the tier that sells fastest in week one |
| Model spread | Which models go to which shops or regions | Identical assortments everywhere, so one region clears stock and another does not |
| Size ratio | How sizes are split per model | A flat split across sizes that ignores local body size |
| Colour split | Which colours anchor the display | Too many colours, each in a quantity no shop can display |
| Assembly capacity | Whether units arrive assembled or need workshop time | Planning the container without planning the build-up |
| Refill trigger | The stock level that starts the next order | Waiting for empty shelves before reordering |
Assembly state affects both the container count and the dealer’s workload; the options are compared on the assembly state page.
Questions buyers ask
Can I set my own size split within the MOQ?
Yes. MOQ is 100 units per model and the size and colour split inside that 100 is set by the buyer in the purchase order.
How much stock should I hold back after landing?
Around a fifth of each model as a central reserve is a workable starting point. Adjust once you see weekly sell-through by shop.
Should I put every model in every shop?
No. Open two or three hero models fully in each shop and add depth later. A full size run of one model outsells two units of five models.
When should I reorder?
Before you are out. Production is 25 to 30 days, 30 to 45 days in peak season, plus freight, so plan the reorder while you still have weeks of cover.
Can spare parts be loaded with the bike order?
Yes, if there is space after the bikes are packed. Load only parts that support the models in the container, plus a warranty kit.
Related guides
Build the order right before you plan the landing: planning the SKU mix for a first container, the frame size ranges for wholesale orders, and wholesale price tiers.
Send us your order details
For a wholesale quotation, tell us the models, quantities, size split, destination port and whether you need OEM branding. Write through the contact page or email bolunmaoyi@gmail.com. MOQ is 100 units per model, 30% deposit with the balance before loading, FOB Tianjin or Qingdao.
Further reading
Category: bicycle buying guides index — the full guide list by topic. · Site map