On this page
Why two price lists for the same bike never match
A price list is built on the spec and the MOQ. Put the model list, quantity and destination port in the RFQ; the reply returns FOB per model with the MOQ stated.
Two suppliers quote the same model at what looks like the same FOB price, and one container ends up costing eight percent more. The difference is almost never the unit price. It is the model year code, the tier the quote was written for, the packing assumption, and what the sheet quietly leaves out.
This is a reading guide for a bicycle price list, not a lesson in negotiation. If you can read the sheet properly, the negotiation starts from the right number.
What a usable quote sheet has to contain
| Element | What it should say | What goes wrong without it |
|---|---|---|
| Model year / revision | A code such as MY26 or a revision number on the sheet | You compare last year’s spec against this year’s component |
| Unit price basis | FOB port, per unit, currency | EXW and FOB get mixed, and inland haulage disappears |
| Quantity tier | The break points the price applies to | You plan 200 units against a price that needs 500 |
| Validity | Date or “valid 30 days from issue” | You quote your own customer off an expired sheet |
| Packing | Carton spec, assembly state, units per carton | Freight per unit is calculated on the wrong cube |
| MOQ per model / per colour | Separate numbers for model and colour | You assume 50 per colour and the factory needs 100 |
| Component spec | Group set, brakes, wheels, or an attached BOM | “Same bike, cheaper price” turns out to be a different bike |
| Options and adders | Colour, decal, logo print, component substitution | Adders appear after you have committed |
| Payment terms | Deposit and balance percentages, method | Cash flow is planned on the wrong terms |
The tier column is the one people misread
Tiers are usually written per model, and the break points are set by how the factory batches production, not by how you want to buy. A 200-unit tier often exists because 200 is what fits a colour run, not because 200 is a nice number.
Two consequences:
- Mixing models to reach a tier usually does not work. Tiers are per model or per model family, and a sheet that says otherwise should be checked in writing.
- Jumping a tier is worth calculating. If 500 units at tier three is cheaper per unit than 400 at tier two, the extra 100 units may still be the better purchase — but only if they sell.
What the price does not include
A price list is a factory-gate document. It is not a landed cost. The items normally outside it:
- Freight, insurance and destination charges — see the freight side in LCL versus FCL freight maths.
- Import duty and clearance — the classification logic is in HS codes and import duty.
- Assembly, PDI and local warehousing after arrival.
- Certification or testing the buyer requires, when it is not part of the standard spec.
A supplier who hands you a sheet with a landed cost column is either absorbing those items or guessing at them. Ask which.
Comparing two sheets properly
- Normalise the basis. Put both on FOB, same currency, same date.
- Match the tier. Compare your actual order quantity, not the headline price.
- Match the spec. Line up the component list item by item. A cheaper shifter or a different tyre is where the difference usually hides.
- Match the packing. Units per carton changes freight per bike and warehouse space.
- Add the adders you actually need. Custom colour or decals are rarely in the base price.
- Check the validity. An expired sheet is a starting point, not a commitment.
Five questions to send back with the sheet
- Which tier does this price apply to, and what are the other breaks?
- Is the component spec locked for this model year, and what is the substitution policy if a part is unavailable?
- What is the MOQ per colour, and what does a colour change add per unit?
- What is the carton specification at this price, and what changes if we go to a different assembly state?
- How long is the price held, and what triggers a re-quote?
Two documents look similar and are used differently: a price list sets the dealer’s shelf price, a quotation answers one order. Before building the list, read how a quotation is read and check that the list carries the same structure — specification, term, port, packing, validity, payment — otherwise the dealer cannot compare a quotation against the list. The quantity structure behind each break is set out in the MOQ planning page.
Questions buyers ask
Should the price list include freight?
Usually not; it is a factory price. If a supplier offers a delivered price, ask which port, which Incoterm and which validity, because those three change the number.
Why is the model year code so important?
Because component specs change between years without the model name changing. Without the code you can be comparing two different bikes that carry the same name.
Can we get a price for a mixed container?
Yes, but it is normally quoted model by model at the tier each model reaches, then totalled. It is not one blended price for the container.
Is a lower price at a higher tier always better?
Only if the extra units sell. The saving per unit on the extra quantity is rarely enough to cover stock that sits for a season.
What if a component is discontinued mid-order?
The sheet should say. In practice you get a substitution of equal or better level, or a price adjustment — the point is that the policy is written before the order, not after.
Next step
Send your target models, quantities and destination to the RFQ page and ask for a sheet with the tier breaks stated. For the reasoning behind tiers, read wholesale bicycle price tiers.
Related pages
Category: bicycle buying guides index — the full guide list by topic. · Site map