Two quotations can carry the same headline price and produce very different landed costs. The difference is usually in the fields that were left out: what specification the price is based on, what is included in it, how long it holds, and what happens when the order changes.
This guide sets out what a quotation should contain before it can be compared, and the omissions that most often turn into cost later.

The specification the number is attached to
A price without a specification is not a quotation, it is a placeholder. The quotation should state the build it refers to, at the level of component groups: frame material and construction, fork, brake type, drivetrain, wheels and tyres, saddle, grips, pedals, and whether lights, racks or mudguards are included.
Where the supplier offers tiers, each tier should be priced separately with its component differences listed. “Good, better, best” without part numbers is not enough to compare against another supplier’s offer.
The model code matters as well. If the quotation uses a code, the code should correspond to a specification sheet that both sides can open and reference in the contract.

Price terms and what they include
The quotation must name the price term: ex-works, FOB a named port, CIF or another arrangement. The difference between ex-works and FOB is not a small margin; it includes inland transport, export clearance and port handling, and it changes who is responsible for the risk up to the vessel.
Beyond the term, three inclusions are frequently left implicit:
- Packaging: is the carton cost inside the price, and what carton specification?
- Accessories: are pedals, training wheels, bottle cages or tools included?
- Marking: are carton marks and barcodes included, or charged separately?
A quotation that does not answer these is comparable only after the questions are asked.
MOQ, size and colour structure
Price is normally tied to a quantity structure, not a single number. The quotation should state the minimum order quantity per model, per colour and per size, and what happens to the price when the structure changes.
Distributors often discover this late: a price is quoted for 200 units per colour, but the market needs 60 units across four colours. The re-quote at the real structure is higher, and the plan has to be rebuilt.
If the supplier offers a mixed container allowance, the quotation should say how many models and colours can be mixed and how the price is affected.
Packing and loading data
The quotation should include the data an importer needs to calculate freight: carton dimensions, units per carton, gross weight per carton, and the assembly state assumed.
Without carton data the freight estimate is a guess, and the landed cost comparison between two suppliers is unreliable. Asking for carton data also filters out suppliers who have not actually produced the model.
Validity, currency and payment
Three commercial fields decide whether the quotation is usable:
Validity period. Material and freight costs move; a quotation without an expiry date is either a guess or a trap. A stated validity of 15 or 30 days is normal.
Currency and exchange basis. If the price is in a currency other than the buyer’s, state the currency and whether it is fixed for the validity period.
Payment structure. Deposit percentage, balance trigger (before shipment, against documents, or after arrival), and the accepted methods. Payment terms change the financing cost of the order and belong in the comparison.
The change and defect clauses behind the price
A quotation is the commercial summary of a contract that has not been written yet. Two clauses affect the effective price more than the headline number:
The defect allowance. What defect rate is accepted, how claims are evidenced, and whether the remedy is replacement, credit or repair.
The change procedure. What happens when the buyer changes a colour, decal or component after the order is confirmed: re-price, schedule impact, and who bears the cost of parts already ordered.
Suppliers who state these up front are usually easier to work with, because the conversation about problems happens before there is a problem.
A comparison sheet that works
Line up the quotations in one table with these rows: model code, specification tier, price term, unit price, MOQ per colour and size, carton data, packaging and accessories included, validity, currency, payment structure, defect terms, lead time.
Any row that is blank is a question to ask, not a number to guess. The comparison is only honest when every cell is filled from a written answer.
BOLUN’s purchase contract checklist covers the clauses that follow the quotation, the MOQ planning guide explains how quantity structure changes price, and the landed cost guide shows where the quotation fields enter the total. For the paperwork behind the price, the supplier verification guide covers what to confirm before a deposit is paid.
Model ranges and their specifications sit under children’s bicycles, mountain bicycles, city bicycles and compatible parts.
Questions to send with the first enquiry
- Which specification sheet does this price refer to, and can you send it?
- What price term is this, and what is included in it?
- What is the MOQ per model, colour and size, and what is the price at our real structure?
- What are the carton dimensions, units per carton and gross weight?
- How long is the price valid, and in what currency?
- What payment structure do you require?
- What are the defect terms and the change procedure?
Seven questions, one reply, and the quotations become comparable. Most of the cost surprises in a first order come from a quotation that was never asked these questions.
Related guides on this site
Other guides in this series cover the decisions that sit next to this one:
All buyer guides on this site are indexed on the bicycle wholesale buying guides page.
Where this sits on the site
If you are putting a container together, the pages below carry the model range, the trade terms and the quote form.