Two charges arrive on the same invoice and look like the same charge. They are not, and knowing which one you are paying decides who you argue with and what you fix next time.
Demurrage is inside the terminal, detention is outside
Detention and demurrage run on the buyer’s clock, not ours. The RFQ takes model, quantity and destination port; the reply gives the free days and the loading window we plan for.
Demurrage is charged when the container sits inside the terminal past its free time — you have not cleared it, or you have cleared it and not moved it. Detention is charged when the container leaves the terminal and comes back late — it is sitting at your warehouse, your dealer’s yard, or on a truck that has not been unloaded.
The clock, the free days and the daily rate come from the carrier’s tariff for that container and that port, not from what your forwarder said on the phone. Ask for the tariff in writing before the vessel sails, not after the invoice arrives.
Why bicycle containers get caught
Bicycle containers are not usually delayed by the goods. They are delayed by paperwork and appointments. The bill of lading is released late because the balance payment has not cleared. The certificate of origin is missing a detail. Duty and tax are paid on the last day. The truck is not booked because nobody knew the vessel would arrive two days early. The warehouse has no appointment for a forty foot high cube.
Each of these is a day. Four days of demurrage on a forty foot container costs more than the freight difference between two forwarders, and it lands on the buyer under FOB.
What to do before the vessel arrives
- Confirm the ETA with the carrier, not only with the forwarder, five days out.
- Have the bill of lading draft checked before sailing, so corrections are not discovered at discharge.
- Pay duty and taxes before arrival where the destination allows pre-payment.
- Book the truck and the warehouse slot against the ETA, and keep both movable by two days.
- Ask the forwarder for the free time in writing, per container type, and put it in the shipment file.
Who pays, under which term
Under FOB the buyer controls the destination leg, so demurrage and detention at destination normally sit with the buyer, even when the seller booked the vessel as a favour. Under CIF the seller pays the freight to the destination port, but charges that arise after discharge still depend on the contract and on who is named as consignee. Under DAP the seller carries more of the risk, and the delivery appointment becomes the seller’s problem.
Whichever term applies, the practical rule is the same: the party who controls the appointment controls the charge. Write it into the contract rather than discovering it on an invoice.
How to reduce exposure
Split the release if the forwarder allows it: telex release or a sea waybill instead of an original bill of lading saves three to five days on short routes. Pre-clear customs as soon as the manifest is filed. Book the truck before the container is discharged, and confirm the warehouse can take a high cube with a lift gate. Where the volume justifies it, negotiate extra free days into the contract instead of paying them one container at a time.
What not to do
Do not refuse the container to make the charge go away. Storage keeps running, the carrier keeps charging, and after a point the goods are moved to a bonded warehouse at your cost with a lien on them. Do not abandon a container of bicycles to avoid a charge that is smaller than the value of the goods inside it.
Who pays what, under which term
The allocation follows the trade term, not the good intentions of either party. Four common cases.
| Term | Demurrage at destination | Detention on boxes | Who moves first |
|---|---|---|---|
| FOB | Buyer, once the container is on board | Buyer, from pickup | Buyer’s broker |
| CIF | Buyer, unless the contract says otherwise | Buyer, after delivery | Buyer, with the seller’s documents |
| DAP | Seller up to the named place | Split by what the contract states | Seller’s forwarder |
| DDP | Seller, including clearance delays | Seller | Seller |
Read the contract for the words “free time” and “per day” before the vessel sails; after it berths, the clock is the only thing that matters.
Questions buyers ask
What is the difference between demurrage and detention?
Demurrage is the container sitting inside the terminal past free time. Detention is the container outside the terminal, at your yard or on your truck, returned late.
How many free days do I get?
It depends on the carrier, the port and the container type, and it is stated in the carrier tariff. Ask for it in writing before the vessel sails rather than relying on a verbal figure.
Who pays under FOB?
Normally the buyer, because the buyer controls the destination leg and the delivery appointment. That does not change if the seller booked the vessel as a courtesy.
Can these charges be avoided entirely?
Not always, but most of them come from late documents, late duty payment and unbooked trucks. Fixing those three removes most of the exposure.
Do I lose the goods if I do not pay?
The carrier can hold the cargo and charge storage. Abandoning the container does not end the charges; it usually increases them and adds a lien.
Related guides
- Destination port selection for importers
- Incoterms: FOB, CIF and DAP
- Import shipping documents checklist
Send us your order details
If you are building a range and want a price against a real specification, send the model list, the quantity per model, the destination port and whether the order is OEM or our own decals. We quote on that, not on a photo. Write to our contact page or bolunmaoyi@gmail.com.
Working terms: MOQ 100 units per model, 30 percent deposit with the balance before loading, 25 to 30 days in normal season and 30 to 45 days in peak season, FOB Tianjin or Qingdao. CIF and DAP are quoted separately.
Category: bicycle buying guides index — the full guide list by topic. · Site map