Bicycle Order Amendments: What Each Change Costs

An order is not a shopping cart. Once the deposit is in and the materials are booked, the order is a place in a production schedule, and changing it is not an edit — it is a re-plan. The cost of the change depends entirely on when you make it.

Five windows, five different costs

Amendments are costed, not absorbed. The RFQ takes model, quantity and destination port; the answer sets the amendment window and what a change costs after the cut-off.

Before the proforma is signed. Everything is free. Quantities, colours, models, carton print, decals.

After the deposit, before materials are ordered. Usually free or nearly free, provided the paint batch has not been scheduled and the decal film has not been printed.

After materials are ordered. Frames, tyres, cartons and decals are already committed. A change now means either surplus material or a re-order lead time, and both cost money.

After paint and decals. A colour change at this point means stripping or scrapping painted frames. A decal change means new film and a second pass through the line. This is the most expensive window that is still fixable.

After assembly. Nothing changes without rebuilding, and rebuilding a finished bicycle costs more than the margin on it.

What changes cheaply, and what never does

Adding units of a model already in production is usually easy if the components are in stock. Adding a model from the same family, same frame, same colour, is manageable. Adding a colour that is already in the paint schedule costs almost nothing. Shifting a delivery date later is usually free; pulling it earlier is not.

Changing a frame size, swapping a model, redesigning a decal or reprinting cartons after the print run has started all fall into the expensive group, and none of them can be absorbed quietly.

The amendment sheet

One page, dated and signed by both sides, listing what was before, what is now, the price difference, the new delivery date, and any deposit adjustment. It references the original proforma number. Without that page, the change exists only in a chat thread, and the factory will build what its own paperwork says.

Verbal changes are the fastest way to receive 350 bicycles in the wrong colour. The person on the floor builds from the job card, not from the conversation.

Why the schedule moves

A change after materials are ordered does not just cost the material. It pushes the order behind others already queued for the same paint slot, the same decal run or the same assembly line. That is why a small change in the middle of peak season can move a delivery date by weeks while the same change in July costs a day.

Cancellation, in tiers

Cancellation is priced the same way as amendment: before materials, after materials, after paint, after production. The percentages are whatever the contract says, and they should be written before the order, not negotiated after the argument starts. A contract that only says “deposit non-refundable” tells neither side what happens to a half-built order.

Protect both sides

Freeze the specification before the paint slot is booked and put the freeze date in the proforma. Keep a written list of what is still changeable and until when. If a change is commercially necessary, say so early and accept that the price or the date will move — a supplier who agrees to both is a supplier who is planning to cut something inside the bicycle.

Change windows and what each one costs

Every order passes through five windows. The same change costs something different in each one, which is why the amendment sheet exists.

Window Typical change What it costs
Before material order Model, colour, quantity An email and a new quotation
After material order, before cutting Colour, decal artwork Material already bought; schedule may hold
After cutting, before welding Frame size mix Cut tube set aside; partial loss
After painting Colour or decal Painted frames that cannot be relabelled
After packing Carton marks, accessories Repacking labour and printed cartons

The rule that follows: the later the window, the more the change costs, and the less the schedule can absorb it.

Questions buyers ask

Can I change the colour after paying the deposit?

Usually yes, before the paint batch is scheduled. Once frames are painted, changing colour means repainting or scrapping them, and that is charged.

What is the cheapest time to change an order?

Before the proforma is signed. After that, the earlier the better, and the cut-off points are materials ordered, paint, decals and assembly.

Does an amendment always move the delivery date?

Not always, but often. Materials ordered later, or a queue position lost, both push the schedule, and peak season makes it worse.

Do I need a signed amendment?

Yes. The factory builds from its job card. An unsigned change stays in the chat and the job card stays as it was.

What if I need to cancel?

Cancellation is charged by stage: before materials, after materials, after paint, after production. The percentages belong in the contract, agreed before the order.

Related guides

Send us your order details

If you are building a range and want a price against a real specification, send the model list, the quantity per model, the destination port and whether the order is OEM or our own decals. We quote on that, not on a photo. Write to our contact page or bolunmaoyi@gmail.com.

Working terms: MOQ 100 units per model, 30 percent deposit with the balance before loading, 25 to 30 days in normal season and 30 to 45 days in peak season, FOB Tianjin or Qingdao. CIF and DAP are quoted separately.