The second order is where most importers lose the margin they made on the first. The first container is planned with care because everything is new; the second is planned from memory, with last year’s quantities, last year’s colour split and a carton count that nobody re-checked.
A repeat order is a different exercise: it should be driven by what actually sold, what is still in stock, and what the market will look like when the goods arrive, not by what was ordered last time.

Start from sell-through, not from the previous order
The previous order answers a different question: what did the importer believe the market wanted? The repeat order should answer what the market did want.
For each model, list: units received, units sold, units still in stock, and the weeks of cover the remaining stock represents at the current selling rate. That last figure is the one that decides reorder timing — a model with six weeks of cover at a 12-week lead time will run out before the next container arrives.
A simple rule that avoids most stockouts: reorder when remaining cover equals lead time plus one month of safety.

Rebuild the size and colour ratio
The ratio that looked sensible before the first container usually has a pattern by the time the second is planned: one size sells out first, one colour sits, a model that looked like the volume line turns out to be the slow one.
Rebuild the ratio from actual sales, keeping one deliberate exception — the size or colour that is expected to grow. For example, if a 20-inch kids bike sold faster than a 16-inch, the second order should shift weight upward, but not eliminate the smaller size if the market still buys it.
Where a colour did not sell, the decision is not simply “order less”. It may be the colour, the merchandising, or the price point. Ordering less of a dead colour keeps a dead SKU alive; replacing it is often better.
Keep the component and specification continuity
Changing a component between orders creates a spare parts problem: two versions of the same model in the market, two sets of warranty parts, and distributors who cannot tell them apart.
If a component must change because a sub-supplier discontinued it, the change should be documented, approved and reflected in the specification annex — and the spare parts order should cover both versions for the transition period.
The practical default: keep the build stable for at least two orders, and change it deliberately rather than as a side effect of a supply shortage.
Carry spare parts forward
Spare parts planning is not a one-off. Each container adds installed base, and each installed base raises the annual parts requirement. A second order without a proportional parts top-up leaves the first cohort uncovered.
The spare parts ratio guide sets out how the float is sized; for a repeat order the useful change is to allocate parts by installed base per model rather than by container value.
Time the order against the selling season, not the calendar
Two clocks matter: the supplier’s lead time and the destination’s selling season. Working backwards from the season is more reliable than working forwards from the order date, because shipping schedules move.
For a spring season, the container should arrive with enough time to distribute before demand starts, not during it. That usually means ordering in the low season and accepting a longer effective lead time in exchange for a calmer production schedule.
What to change in the contract
A repeat order is a chance to fix what the first order revealed: the supplier who was slow to answer, the inspection that found the same defect twice, the documentation that arrived late.
Three clauses worth tightening: the pre-production approval requirement (if substitutions keep appearing), the inspection notice period (so a re-inspection is possible within the schedule), and the defect remedy (credit versus replacement, and who pays freight).
A one-page repeat order worksheet
- Units received, sold, in stock, weeks of cover, per model and size.
- Lead time plus one month of safety cover = reorder trigger.
- New size and colour ratio from actual sales.
- Component changes: none, or documented and approved.
- Spare parts top-up by installed base.
- Target arrival date from the selling season, working backwards.
- Contract clauses to tighten from the first order.
The worksheet is short on purpose. A repeat order fails not from a missing calculation but from assuming the first order’s numbers still describe the market.
BOLUN’s range planning guide covers how the initial range is built, the MOQ guide explains quantity structure, and the payment terms guide covers how the deposit and balance are structured for a repeat order.
Current ranges sit under children’s bicycles, mountain bicycles, city bicycles and compatible parts.
Related guides on this site
Other guides in this series cover the decisions that sit next to this one:
All buyer guides on this site are indexed on the bicycle wholesale buying guides page.
Where this sits on the site
If you are putting a container together, the pages below carry the model range, the trade terms and the quote form.