Bolun Bicycle

Bicycle Parts BOM and Exploded Diagrams

The most expensive document in a wholesale bicycle program is the one nobody orders: a parts list that matches the bicycle you actually sold. Without it, every spare parts email starts with a photograph and ends with the wrong part on a plane.

Why the bill of materials matters commercially

A BOM breakdown follows the model you name. Send the model, the parts to split out and the quantity via the RFQ, and the quote returns FOB at part level.

A bill of materials is the list of every component on one model, with its specification and quantity. An exploded diagram is the same list drawn as a picture, so a dealer can point at a part instead of describing it. Together they turn “the thing that holds the rear derailleur” into a part number that can be picked, packed and priced.

For an importer, the BOM is the difference between a spare parts program and a spare parts argument. For the factory, it is the difference between a repeat order and a re-quote, because a stable BOM is what makes a stable price.

What a usable parts list contains

  • item number that never changes for that model
  • description in plain English, plus the Chinese term the factory uses internally
  • size or specification: 26 inch, 7 speed, 31.8 mm, 3/32 chain
  • position on the bicycle: front, rear, left, right, drive side
  • quantity per bicycle, so a claim for two levers is not read as two pairs
  • which models the part fits, by model code, not by name
  • whether the part is standard across the range or unique to one model

Anything missing from that list becomes a question at the worst possible moment, which is when a dealer has a customer waiting.

Version control, or the same part three ways

A BOM is only useful if it has versions. When a saddle, a tyre or a shifter changes, the version changes and the old version stays available for bikes already in the market. Factories that rewrite the BOM in place create a document that describes today’s bicycle and cannot serve last year’s.

Ask for the version date on the first page and the model year it applies to. If there is no date, there is no version control.

Exploded diagrams: what dealers actually use

Dealers do not read BOMs. They look at a picture. A single exploded view per model, with numbered callouts that match the item numbers, is enough for most after-sales work. It does not need to be a technical drawing; a clean line illustration with a numbered legend is what gets used.

Ask for it at the sample stage. Asking after the first container is when the factory charges for artwork, or produces a diagram from a different model because that one was quicker to draw.

How to weight a spare parts order from the BOM

With a BOM, spare parts planning stops being guesswork. You can see which parts are shared across the whole range, stock those deeper, and stock the model-specific parts shallow. Wear items — tyres, tubes, chains, brake pads, grips — follow the volume of the model. Cosmetic items — decals, chainguards, mudguards — follow the colour mix, which is a different number.

Setting it up without extra cost

Put three lines in the purchase order: the factory supplies a BOM per model with version date, an exploded diagram per model in a usable file format, and both are updated when a component changes during the order. Most factories will do this at no charge for a programme order. The cost of not doing it shows up later as air freight on a two dollar part.

What a usable parts list has to contain

A parts list that only names components is a shopping list. A list that can be ordered from, priced and traced needs six fields per line.

Field What it looks like Why it is needed
Part name and position Rear derailleur, 7-speed, direct mount Identifies the part without a photo
Maker and model The maker’s own designation Allows substitution decisions later
Quantity per bike 1, 2, or a set Turns a bike order into a parts order
Interface Clamp size, axle standard, mount type The only field that decides fit
Version or date The revision this line belongs to Stops two versions being ordered at once
Spare ratio Units per hundred bikes Sizes the spare parts line

With these six fields, the spare parts order can be calculated instead of guessed, and a dealer query can be answered from the list.

Questions buyers ask

Is a BOM the same as a packing list?

No. A packing list says what is in the container. A BOM says what is inside one bicycle, component by component, with specifications and quantities.

Do I need an exploded diagram for every model?

For every model you intend to support after-sales on. A single diagram per frame family is often enough if the variants share the components.

Who should own the BOM?

The factory produces it, the importer keeps the current version, and both agree that changes are versioned rather than edited in place.

Will the factory share it before I order?

Usually at sample stage, sometimes only after the order is confirmed. Put it in the purchase order so it is a deliverable, not a favour.

How does the BOM help spare parts pricing?

It separates shared parts from model-specific parts, so you can stock the shared items deeper and avoid carrying slow-moving parts for every colour.

Related guides

Send us your order details

If you are building a range and want a price against a real specification, send the model list, the quantity per model, the destination port and whether the order is OEM or our own decals. We quote on that, not on a photo. Write to our contact page or bolunmaoyi@gmail.com.

Working terms: MOQ 100 units per model, 30 percent deposit with the balance before loading, 25 to 30 days in normal season and 30 to 45 days in peak season, FOB Tianjin or Qingdao. CIF and DAP are quoted separately.

Further reading

Category: bicycle parts wholesale range — categories, MOQ and mixed cartons. · Site map