Bolun Bicycle

Factory Visit Agenda for Bicycle Buyers in China

A one-day factory visit will not tell you whether the supplier is good. It will tell you whether the factory is organised, and organisation is the part that decides whether your container arrives complete. The mistake buyers make is walking the floor looking impressed instead of looking for the four or five things that are visible in an hour.

What a visit can and cannot prove

A factory visit is planned around the line you are buying. Send model, quantity and your dates in the RFQ; the reply sets the agenda, the lines shown and who attends.

A visit proves what you saw on that day: whether there is a QC station, whether the assembly line has torque wrenches, whether cartons are printed and stacked properly, whether the warehouse is dry, whether anyone can tell you the serial number of a frame. It does not prove financial stability, export history or component honesty. Those come from documents, references and the first order.

Morning: frames and paint

Start where the frame is made or where it is received. Look at the welding jig, the alignment check after welding, and the gauge used to check the dropouts and the head tube. Ask what happens to a frame that fails the alignment check — the answer tells you whether the station exists or is a table with a gauge on it.

Then the paint line. Look at the pre-treatment tanks, the drying oven, and how frames are hung. Ask how many colours are in the schedule that week and how the line is cleaned between them. Colour contamination is the defect buyers photograph most often at destination.

Midday: wheels and assembly

Wheel building is the best indicator of competence. Look at the truing stand, whether spokes are tensioned by machine or by hand, and whether every wheel passes the stand or only a sample. On the assembly line, watch the takt: how long one station takes, whether there are buffers, whether the same person does brakes and gears.

Find the test station. A bicycle should leave the line with brakes adjusted, gears indexing through the range and wheels true. If there is no test ride and no stand, the dealer becomes the test station, and you pay for it in warranty labour.

Afternoon: packing and warehouse

Watch the packing line for five minutes. Are cartons printed with the right model and label before packing, or labelled afterwards from a stack? Are pedals, tools and manuals in the box, or added at the end from a bin? Is there a scale?

Then the warehouse: dry floor, cartons off the ground, and a loading area that can take a forty foot container without moving pallets by hand through a door. Look at the spare parts store. If spare parts are kept in an unlocked room with no model labels, your after-sales parts will be wrong at least once.

Twelve questions for the floor

  • Who signs off a frame before paint, and what do they check?
  • How many units per hour does this line complete, and how many lines run today?
  • What is the reject rate at final check, and what happens to a rejected bike?
  • Can you show me the torque specification for the stem and the seat post?
  • How is a frame number recorded, and can you trace one bicycle back to its component batch?
  • Which components are on allocation this quarter?
  • How do you handle a colour change between two models on the same day?
  • Who writes the packing list, and who checks it against the cartons?
  • Where do spare parts come from when a dealer claims in month eight?
  • What is your loading window, and who supervises loading?
  • Which markets do you ship to most, and which documents do they need?
  • If I place an order today, where does it sit in the schedule?

Red flags worth remembering

No QC station at the end of the line. No torque wrench visible at assembly. Cartons of three different models stacked together with handwritten labels. Frames standing on bare concrete next to a wet floor. Nobody able to name the person responsible for final inspection. A sample room full of bicycles with no specification sheets.

None of these proves the factory is bad. Each one is a question you want answered before you send a deposit, because all of them turn into problems at destination, where you cannot fix them.

The day after

Send a short written summary the next morning: what you saw, what you still need in writing, and the three points you want confirmed before the proforma. A visit that ends with handshakes and no follow-up email is a visit that changed nothing.

A factory visit is worth the trip only if it answers questions a video call cannot. The table is what buyers usually put on the agenda.

Area What to look at What would make it a problem
Production lines Line count, station layout and what is running that day A line running a model that is not on your order, or an idle line
Frame and paint Welding, alignment checks and the paint line Paint work sent out with no control over the batch
Assembly and packing How units are built, checked and cartoned Inspection done by the same people who assemble
Parts store Which components are held and how they are identified Unlabelled stock with no link to a model
Records Production records and inspection sheets for recent orders No records available for anything already shipped
Capacity claim Monthly output per model family, with the lines behind it A capacity figure that cannot be matched to the floor

What the visit verifies feeds into the deposit decision on the supplier verification page.

Questions buyers ask

How long does a useful factory visit take?

One full day on the floor covers frames, paint, wheels, assembly, packing, warehouse and the spare parts store. Half a day is a showroom visit, not a factory visit.

Should I visit before or after the sample?

Before the sample if the order is large, after the sample if it is a first small order. Either way, visit before the deposit, not after.

Can I ask for a video instead?

A video shows what the factory chose to show. It is useful for a repeat supplier, not for a first decision.

What should I photograph?

The QC station, the alignment gauge, the truing stand, the torque wrench, the carton label, the loading area and the spare parts store. Dated photographs are evidence; impressions are not.

Does a good visit mean a good supplier?

No. It means the factory is organised on that day. Financial health, export record and component honesty come from documents, references and the first order.

Related guides

Send us your order details

If you are building a range and want a price against a real specification, send the model list, the quantity per model, the destination port and whether the order is OEM or our own decals. We quote on that, not on a photo. Write to our contact page or bolunmaoyi@gmail.com.

Working terms: MOQ 100 units per model, 30 percent deposit with the balance before loading, 25 to 30 days in normal season and 30 to 45 days in peak season, FOB Tianjin or Qingdao. CIF and DAP are quoted separately.

Further reading

Category: bicycle buying guides index — the full guide list by topic. · Site map