Bicycle Pre-Shipment Inspection Checklist

An inspection that happens after the container is sealed is not an inspection. It is a report. The checklist below is the one that actually protects a deposit, and it runs before the container leaves the factory yard.

When the inspection should happen

Inspection scope is fixed before booking. Give model, quantity and destination port in the RFQ; the reply names the AQL level, the cartons sampled and who signs the report.

Production finished, every carton counted, and the goods staged in the loading area. Not during production, and not on the day the container arrives. If the inspection is booked on loading day, there is no time to rework anything that fails.

For a first order, leave two days between the end of production and the loading date. That gap is where rework lives.

What to check, in order

1. Quantity and model mix

Count cartons against the packing list, per model and per size. A shortage found at destination is a claim; a shortage found at the factory is a phone call. Count the cartons before opening the pallet.

2. Paint and decals

Check the colour against the approved sample in daylight, not under factory lighting. Check decal position, spelling and size on three units per model. Colour drift between batches is the most common complaint on container orders, and it is almost always visible at this stage.

3. Assembly and function

On sample units: brakes pull and release cleanly, the drivetrain shifts through its full range, wheels spin without a wobble, the headset turns without play, and the kickstand carries the bike. Small hands matter on kids bikes, so check brake reach and standover height there.

4. Dimensions and specification

Wheel size, frame size, bar diameter, brake type, tyre size and drivetrain speed, each against the purchase order, not against the catalogue. One wrong bar diameter turns a whole model into spare parts.

5. Packing

Carton print, model and barcode labels, quantity per carton, dividers and padding. Open two cartons per model and check what is inside against the packing list, including the small accessories that get left out: bells, reflectors, training wheels, tools.

How many units to check

AQL 2.5 is the common sampling level on bicycle orders, with a critical defect list of its own: brakes that do not stop the wheel, forks with cracks, and frames with visible weld defects. Critical defects are not sampled. One is enough to stop the shipment. Without an AQL plan, check three units per model and every carton label.

Who should do it

Either a third party inspection company or your own representative. What matters is that the inspector works from your specification, not from the factory description of it. Give the inspector the purchase order, the approved sample photos and the packing list. An inspector without those three documents is measuring opinion.

What the report should contain

  • Date, factory address and the inspector name
  • The specification used, and any deviation from it
  • Carton count per model, against the packing list
  • Photos of defects with the carton number visible
  • A clear verdict: pass, pass with rework, or fail
  • What rework is required, and the date it will be re-inspected

What usually fails

In order of frequency on container orders: paint shade differences between units, decal position, missing small accessories, tyre brand substitution, and carton print errors. None of these are expensive to fix at the factory. All of them are expensive at the destination.

What to do with a failed inspection

Three options, and the contract should say which applies. Rework and re-inspect, usually the cheapest. Ship with a price adjustment, when the defect is cosmetic and the market will take it. Reject the batch, which is the last resort because it usually means a lost season rather than a lost order.

Whichever route is chosen, put it in writing before the container is loaded, including who pays for the re-inspection.

Inspection and payment

On our orders the balance is paid against the inspection report and the loading photos, not before. Buyers who pay the balance before the inspection are paying for a promise. Buyers who pay against a report are paying for goods they have seen.

The cost of skipping it

An inspection on a 40HQ costs a fraction of one container margin. The defects it catches are the ones that would otherwise arrive as claims, discount requests and unsold stock, and those costs land on the buyer, not the factory.

Related reading: container loading and shipping terms, supplier verification before a deposit, and the purchase contract checklist.

Two related records: the factory audit checklist covers the plant before the order, and third-party inspection covers the shipment after production.

Pre-shipment inspection is the last point where a problem costs a rework instead of a claim. The table is what the check covers before the container is sealed.

Area What is confirmed What it protects
Quantity and mix Units per model, size and colour against the order Short or wrong mix discovered at destination
Build and function Brakes, drivetrain, wheels and steering on sampled units Function faults that appear only after assembly
Finish Paint, decals and touch-up against the approved sample Batch colour drift that cannot be corrected later
Marking Carton marks, labels and barcodes readable and correct A container that cannot be split or scanned
Documents and spares Manual, warranty and spares included per carton Dealers unable to sell or service the units
Loading plan Carton count and stacking against the plan Damage and a loading count that does not fit

Who performs the check and to what standard is on the third-party inspection page.

Questions buyers ask about inspection

Should the inspection happen before or after the balance is paid?

Before. The report is the evidence the balance is paid against; paying first turns the inspection into a formality.

Can the factory refuse third party inspection?

A refusal is a decision, not a detail. Inspection is normal on container orders, and a factory that blocks it is telling you something about the next container.

How long does an inspection take?

One working day for a 40HQ, plus the rework time if anything fails.

Who pays for the inspection?

The buyer, normally. It is the buyer protection and it is priced per man-day, not per container.

What if the defect is only in the cartons?

Cartons are part of the specification. Reprint or relabel at the factory, before loading, not at the destination.

Send us your order details

For a wholesale quotation, tell us the models, quantities, size split, destination port and whether you need OEM branding. Write through the contact page or email bolunmaoyi@gmail.com. MOQ is 100 units per model, 30% deposit with the balance before loading, FOB Tianjin or Qingdao.

Further reading

Related pages

Category: bicycle buying guides index — the full guide list by topic. · Site map