On this page
Every wholesale quotation has tiers, and almost every buyer reads only the tier that matches their first order. That is the mistake: the tier structure tells you what the factory is optimising for, and where your money actually goes.
This page is about what creates the steps between prices, and how to read them without being talked into a bigger order than you can sell.
Six things that create a price tier
Ordering against this? Put the model, quantity and port in the RFQ form and the quotation follows by email.
| Driver | Why it moves the price | Where buyers assume wrong |
|---|---|---|
| Frame material and tube set | Plain tube versus butted; steel versus alloy | That all “alloy frame” is the same frame |
| Welding and finishing | Weld quality, paint coats, decal process | That paint is cosmetic and free to upgrade |
| Drivetrain and brakes | Brand tier, speeds, brake type | That “21 speed” defines the tier |
| Wheels and tyres | Rim, hub, spokes, tyre brand | That wheels are a fixed cost |
| Assembly and packing | 98% versus 85%, carton spec | That packing is a formality |
| Order structure | Quantity per model, colour runs, mixed container | That a bigger total quantity always lowers the unit price |
Where tiers actually sit
Most factories price in three or four bands per model, and the steps are bigger at the bottom than at the top:
| Tier | What changes | Typical step |
|---|---|---|
| Sample / single unit | One-off production, no batch economy | Highest per unit, rarely relevant to a dealer |
| MOQ | One colour run, one model line | The reference price on most sheets |
| Batch | Multiple colour runs in one production slot | Modest step down |
| Programme | Committed annual volume, forecast-based | Largest step down, with commitments attached |
The step from MOQ to batch is usually small; the step from batch to programme is large but conditional on forecast and deposit. If a supplier offers a programme price without asking for a forecast, the price will not hold.
Tier breaks are often per model, not per order
This is the single most misread line on a quotation. A factory that says “500 units, tier three” usually means 500 units of one model, or one model family, not 500 units spread across five models.
- Mixing models to reach a tier usually fails, because each model has its own production batch.
- Mixing sizes within a model usually works, because the size run is one batch.
- Mixing colours within a model works up to the colour-run limit, then adds cost.
Ask which axis the tier counts on: model, size, colour or total. The answer changes the order plan, not just the price.
Why a blended container price is a bad sign
Some suppliers quote one price for a mixed container. It is convenient and usually hides something: either the cheap models subsidise the expensive ones, or the quote assumes a mix you will not order. Ask for a line-by-line table with the tier applied per model, then a total. That is the number you can check.
How to compare two tier structures
- Put both sheets on the same basis: FOB, same currency, same packing, same assembly state.
- Compare at your actual quantity, model by model.
- Note where the next tier starts, and what it would take to reach it.
- Mark which lines are conditional — forecast, deposit, colour commitment.
- Convert the winner to landed cost before deciding.
The reading method for a sheet is in how to read a bicycle price list, and the traps in quotation sheet pitfalls.
Is jumping a tier worth it?
Sometimes, and the arithmetic is simple:
- extra units × unit price at the lower tier
- versus extra units × the saving per unit
If the saving per unit multiplied by the whole order does not cover the cost of carrying the extra stock for a season, the tier is not worth reaching. Most dealers overestimate sell-through of the marginal units. The MOQ side of this calculation is in MOQ economics.
What to ask before accepting a tier price
- Does this tier count per model, per size or per order?
- What is the next break, and what triggers it?
- Is the price conditional on a forecast or a deposit?
- What happens if the actual order lands below the tier after production?
- How long is this tier held, and what re-quotes it?
Five questions. If a supplier cannot answer the fourth, the tier is marketing.
When you have two tier structures to compare, send both to the RFQ form and ask for the per-model quantity behind each break. A tier quoted only as a total is a tier you cannot use to plan the second order.
Questions buyers ask
Is the lowest tier always the best value?
No. It is the lowest unit price with the highest commitment. Value depends on sell-through, not on the number on the sheet.
Can we combine two models to reach a tier?
Usually not, unless they share a frame family and a production batch. Ask before planning the order around it.
Why did the price change between two quotations with the same quantity?
Component tier, packing, currency date or a colour change. Compare line by line, not totals.
Do programme prices need a contract?
They need a forecast and usually a deposit schedule. A programme price without a commitment is a price that will be renegotiated.
Should we ask for the tier table in writing?
Always. A verbal tier is the most common source of a later “that price was for 500 units” conversation.
Send us your order details
Send your model list with quantities per model, colours and destination through the contact page, and we will return a line-by-line table with the tier applied per model. Related: price changes between orders and model comparison.
Further reading
Category: bicycle buying guides index — the full guide list by topic. · Site map