Bolun Bicycle

Bicycle Quotation Sheet: Ten Traps

On this page

Two quotations, same model name, USD 22 apart. On paper the cheaper one wins. On the water it usually loses, because the 22 dollars were not a discount — they were a different product, a different term, or a different set of assumptions that surface later as an extra invoice.

A bicycle quotation is not a number. It is a set of conditions compressed into one figure. The list below is what to check before you compare two of them.

1. The specification is a name, not a build

A quotation is only useful if it names the spec. The RFQ takes model, quantity and destination port; the reply returns FOB with the component list the price is built on.

“26 inch mountain bike, 21 speed” describes a category, not a bike. The price only means something once the frame material, the tube set, the groupset maker and level, the brake type, the rim, the tyre, the hub, the saddle, and the paint process are fixed. Two factories quoting “21 speed” can be quoting different bicycles with a 20 percent cost gap.

Ask for the bill of materials line by line. A supplier who cannot send one is either reselling or does not know their own build.

2. The trade term is missing

A price without FOB, CIF or DAP has no meaning. Our prices are FOB Tianjin or Qingdao, and CIF and DAP are quoted separately on request. Comparing an FOB figure against a CIF figure is comparing a factory-gate price to a delivered-to-port price, and the gap is the ocean freight plus insurance, not margin.

3. The port is not named

FOB Shanghai and FOB Tianjin are different prices even for the same bike, because inland trucking differs. A quotation that says only “FOB China” is not yet a quotation.

4. Packaging is assumed, not stated

Carton specification, carton dimensions, and assembly ratio decide how many units enter a container, and therefore the freight cost per bike. We pack 85 percent assembled for kids bikes — about 850 units in a 40HQ for 12, 16 and 20 inch — and roughly 350 units of 26 inch mountain or 700c city bikes per 40HQ. A supplier quoting a lower price with a weaker carton, or a lower assembly ratio, is quoting a higher landed cost per bike.

20 foot containers are quoted on request, because the real number depends on the exact carton mix rather than on a fixed formula.

5. MOQ is quoted per order when it is per model

This is the most common misunderstanding in first orders. Our MOQ is 100 units per model. A buyer reading “MOQ 100” as a per-order total plans a mixed container of ten models at ten units each and then discovers the order cannot be confirmed. Clarify before the proforma, not after.

6. Payment terms are buried in a footnote

Thirty percent deposit with the balance before loading is our standard. A quotation offering a lower unit price with a different payment structure — say a larger deposit, or an irrevocable letter of credit — is not cheaper in cash terms once you price the financing. Put the payment term next to the price on the comparison sheet, always.

7. The lead time clock starts at the wrong moment

Lead time starts when the deposit clears and the artwork is approved, not when the enquiry is sent. Production is 25 to 30 days, and 30 to 45 days in peak season. A supplier quoting 20 days in October is quoting a calendar that does not exist.

8. Samples and their cost

Sample cost, who pays the courier, and whether the sample cost is deducted from the bulk order are three separate questions. A quotation silent on all three usually means the sample is charged at retail-plus-freight and never credited. Ask for the arrangement in writing before paying for the sample.

9. Warranty and spare parts are treated as free

A warranty that is not written down is not a warranty. Ours is twelve months on frame and fork from the bill of lading date, wear parts excluded, with claims supported by photographs and the frame number. Ask what is covered, for how long, from which date, and what evidence is required.

Spare parts are a cost line, not a courtesy. If the quotation includes “some free spare parts”, ask what exactly, in what ratio to the order, and which models. Otherwise it appears in the container as ten random forks for a model you did not order.

10. OEM and logo costs, quoted as zero

Custom colour, custom decals and custom packaging are not free. A quotation that includes OEM at no extra cost is either absorbing it into the unit price already, or will raise it at the artwork stage. Ask for the OEM cost as a separate line with a stated minimum quantity, so you can see whether it is worth doing on this order.

How to build a comparison sheet that actually compares

One row per supplier. Columns: unit price, trade term, named port, specification summary, carton and assembly ratio, units per 40HQ, MOQ per model, size split, payment terms, lead time with start point, warranty terms, OEM cost with minimum, sample cost and credit, quotation validity, currency.

Fill every column or leave it blank. A blank column is information: it tells you which supplier has not thought about the question yet.

Currency and validity

A price in USD valid for thirty days and a price valid for ninety days are different offers, because the second carries the exchange risk for the seller. State the validity you need, and expect a supplier to hold a price only for the period they can hedge.

The habit that saves the most money

Ask one question of every quotation before comparing it: what is not included in this number? Freight, insurance, inspection, spare parts, OEM tooling, packaging upgrade, certification, and inland trucking are the usual answers. The supplier who names them plainly is telling you they will not surprise you later.

Ten pitfalls, and the line to add to your enquiry

The pitfalls below repeat across markets. Each one closes with a sentence you can paste into an enquiry.

Pitfall Why it costs money Line to add to the enquiry
Model name instead of a build Every supplier quotes a different bicycle “Quote against the attached build list, size by size.”
Missing trade term Two numbers cannot be compared “State FOB or CIF, and name the port.”
Unnamed port Freight is the variable that moves most “Quote to [port], sailing week [x].”
Packing assumed Units per container change the landed cost “Give carton size and units per 40HQ.”
Payment in a footnote Cash flow is part of the price “State deposit, balance and timing.”
Samples quoted at zero The cost returns later, usually doubled “Price the sample and say what is credited on order.”
Warranty without content Spares become an unbudgeted purchase “State period, coverage and spares ratio.”
OEM quoted as free Artwork and tooling reappear as a surcharge “Price artwork, plate and tooling separately.”

Paste these lines into the first message and half the pitfalls are closed before a number is offered. The remaining half are closed by reading the sheet in order, which is what the quotation reading guide sets out; when you have a sheet in hand, the RFQ form will take it for a check.

Two of the pitfalls are really MOQ problems in disguise: a quantity that looks short, and a price that quietly assumes a different batch. If either appears on your sheet, check the layer that binds on the MOQ planning page, and take the sheet through a sample approval checklist if the specification is not yet fixed.

Questions buyers ask

What does one quotation need to contain to be comparable?

Unit price, trade term, named port, full specification, carton and assembly ratio, units per 40HQ, MOQ per model, payment terms, lead time with start point, warranty terms, and validity.

Is MOQ 100 per order or per model?

Per model. The total container can mix several models, but each model needs 100 units.

Are OEM colours and decals included in the unit price?

Not by default. OEM cost is quoted separately with a minimum quantity, so you can decide per order.

How many bikes fit in a 40HQ?

About 350 units of 26 inch mountain or 700c city bikes, and about 850 units of 12 to 20 inch kids bikes at 85 percent assembly. 20 foot containers are quoted on request.

How long is a quotation valid?

Validity is stated on each quotation. Ask for the period you need before comparing prices across suppliers.

Related guides

Compare the terms behind the numbers: FOB, CIF and DAP for bicycle importers, payment terms for China importers, and carton specs and assembly ratio.

Send us your order details

For a wholesale quotation, tell us the models, quantities, size split, destination port and whether you need OEM branding. Write through the contact page or email bolunmaoyi@gmail.com. MOQ is 100 units per model, 30% deposit with the balance before loading, FOB Tianjin or Qingdao.


Further reading

Category: bicycle buying guides index — the full guide list by topic. · Site map