- Inspection: yours, ours, or a third party Three options, and the tender usually names one: Buyer inspection at the factory — you or your agent checks the batch before loading. We arrange access and the sample set. Pre-shipment inspection by a nominated company — SGS, BV or similar, on an AQL sampling plan. The cost is yours, the schedule is agreed before loading. Our own loading record — carton count, photos, seal number. This is evidence, not an inspection; it does not replace a third-party report if the tender asks for one. Whichever applies, the inspection date has to sit inside the production window. An inspection booked after the container is loaded is a delay, not a check. Documents, certificates and honest limits
- Payment, delivery window and the calendar
- What to send us before you bid
- Frequently asked questions
Tender work is specification control, not sales
Tender supply is judged on the spec and the delivery date. The RFQ takes model, quantity and destination port; the reply returns FOB and the documents a tender pack needs.
A government, municipal or NGO tender for bicycles is won on documents and lost on small deviations. The buyer has a fixed specification, a fixed quantity, a delivery window and a payment process that starts after acceptance, not after shipment. A factory that treats it like a normal distributor order ends up with a container that does not match the bid.
We have supplied project buyers where the constraint was not price but identity: every bike the same, every carton marked the same, every unit traceable to a frame number, and the delivery file complete before the invoice is paid.
The five points where tender orders fail
- Specification drift between bid and production. The bid names a 21-speed with mechanical disc brake; the production sheet says 21-speed and V-brake because the buyer changed it verbally. On a tender, verbal does not exist. The production specification must be a signed annex to the contract.
- Certificate the factory does not hold. The tender document requires a conformity certificate or a test report naming a standard. If it is not in our file, we say so before you bid, not after you win.
- Delivery date without a buffer. Production is 25–30 days, 30–45 in peak season, and tenders cluster in the same months. A tender that requires delivery in 60 days from award is a tender that needs a production slot confirmed before you submit.
- Batch identity. Project buyers inspect. If the container mixes bikes from two production runs, the inspection finds it. Build the order as one batch and keep the frame numbers in sequence.
- Payment trigger. If payment starts after acceptance and acceptance requires an inspection report, the inspection has to be planned, not improvised at the port.
Locking the specification: the annex that protects both sides
What the annex should name, per model: frame material and size range, fork type, wheel size and spoke count, tyre size, brake type front and rear, drivetrain and speed count, saddle and grips, fittings (rack, mudguard, basket, lock mount), colour and decal position, carton marks, and the assembly state.
Anything not in the annex is not in the bike. That is the point of the annex — it turns “we assumed” into a document that both sides signed.
Uniformity and traceability
Project buyers often inspect a sample and then a container. The two must match. We keep the batch record, the frame numbers in sequence, the loading photos and the carton count per model and size. If your tender requires a delivery file, tell us at the quotation stage so the file is built during production rather than reconstructed afterwards.
More on the file: component batch records, frame number traceability, container loading supervision.
Inspection: yours, ours, or a third party
Three options, and the tender usually names one:
- Buyer inspection at the factory — you or your agent checks the batch before loading. We arrange access and the sample set.
- Pre-shipment inspection by a nominated company — SGS, BV or similar, on an AQL sampling plan. The cost is yours, the schedule is agreed before loading.
- Our own loading record — carton count, photos, seal number. This is evidence, not an inspection; it does not replace a third-party report if the tender asks for one.
Whichever applies, the inspection date has to sit inside the production window. An inspection booked after the container is loaded is a delay, not a check.
Documents, certificates and honest limits
What we issue: commercial invoice, packing list by model, size and colour, product specification sheet per model, component list, and the batch record. If a certificate of origin or a chamber-issued document is required, raise it at the proforma stage.
What we do not do: issue a certificate we do not hold, describe a test report as a certificate, or sign a declaration about a standard we have not been tested against. Tender buyers sometimes ask the factory to “just put the certificate number on the invoice” — that is the point where a project becomes a liability.
Payment, delivery window and the calendar
Terms are 30% deposit with the balance before shipment. If the tender requires a letter of credit or payment after acceptance, raise it before the proforma is signed — the structure has to be agreed, not discovered.
Work backwards from the delivery window: production 25–30 days (30–45 peak), booking and loading 3–7 days, sailing by destination, clearance and inland delivery. If the window is tight, the only lever is the production slot, which means confirming capacity before the bid is submitted.
What to send us before you bid
- The tender specification, in the form the buyer issued it
- Quantity per model and per size
- Delivery window and destination
- Inspection requirement and payment structure
- Any certificate the tender names — so we can tell you honestly whether we can support it
Related reading: purchase contract checklist, pre-shipment inspection checklist, shipping documents checklist.
A tender is a documentation exercise before it is a product one. The table is what a supplier has to be able to produce on demand.
| Item | What it usually requires | Why suppliers fail at this stage |
|---|---|---|
| Legal status | Licence, registration and tax standing in the supplier’s name | Documents held by a trading company, not the manufacturer |
| Product compliance | Test reports for the models offered, current and in the supplier’s name | Reports that cover a different model or an expired date |
| Capacity evidence | Output and delivery ability stated in a verifiable way | A capacity claim with nothing behind it |
| References | Comparable supply contracts already delivered | References that cannot be contacted |
| Delivery plan | Schedule per batch with the production basis | A schedule that assumes everything at once |
| After-sales | Spares and response arrangement for the contract period | Spares promised without a supply route |
The verification checks behind these documents are on the supplier verification page.
Frequently asked questions
Can you supply against a tender specification?
Yes, if the specification can be met with our models. Send the tender document before you bid so deviations are known early.
Do you provide conformity certificates for tenders?
Only documents we actually hold. We will not put a certificate number on an invoice for a standard we have not been tested against.
Can every bike be identical and traceable?
Yes. One batch, frame numbers in sequence, batch record and loading photos supplied with the delivery file.
What is the minimum quantity for a tender order?
100 units per model. Project orders of 200 to 350 units are normal and can share a container with spare parts.
How long is the warranty on project bikes?
12 months on frame and fork from the bill of lading date; wear parts excluded. Claims need photos and the frame number.
Next step
Send the tender specification and delivery window to the RFQ page or bolunmaoyi@gmail.com before you submit, and you will get a written list of what we can and cannot support.